Winter work in the shop gets us closer to spring

Winter is a great time for projects back in the shop. Finishing off the custom bridge railings and connecting them to the Oil House was this weekend’s focus.

The sections will be hot-dip galvanized and ought to be ready in a few weeks. Then we can prefab the porch, take down the hurricane panels and be ready for spring.

Share Button

2-year Oil House & Footbridge work is done

Billy and Chris install the last railing section, November 4, 2019.

We’re very excited to share the news that our two-year restoration and reconstruction of the historical Oil House and footbridge are now complete.

The original Graves footbridge, a steel structure that spanned the channel in Graves Ledge to link the lighthouse to the granite Oil House more than 100 feet away, was partially destroyed in the Great Blizzard of ’78 and demolished by the “No Name” storm of 1991.

The original wooden roof of the Oil House became unsalvageable after years of heavy storms and neglect.

Even though we used modern engineering and materials, we strived to retain the character and spirit of the original designs. We built a new timberframe roof with a reinforced metal frame, sheathed in copper, and repurposed the original timbers that could be salvaged. We even added a belt course of solid granite.

Now, after 41 years, the Oil House is reconnected to the tower. It will serve as a guest cottage.

Last step this season was to install the replica railings before severe weather sets in, built by Nelson Metal Fabrication of Portland, Maine, and installed by Atlantic Restoration of Boston along with an all-star volunteer crew.