It’s not just metalworking out here. The boys from Driftwood Construction in Nantucket brought every tool in the shop and in just three days framed out the new second floor of the Oil House.
In February with assistance of a helicopter, we added the new second story, made in Philadelphia of cast marine concrete. The new timberframe roof was made last year in Maine.
For the second story floor, the Driftwood Construction crew reused the old 12 x 12 timbers from the ruined original Oil House roof. They added some beautiful reclaimed wood from our friends at Longleaf Lumber.
Thanks Karl, Sonny, Peter, and Jack!
Pingback: Finishing up the second story of the Oil House at Graves - Graves Light Station
Pingback: 2-year Oil House & Footbridge work is done - Graves Light Station