Making progress inside

gl-before-after-level-2Time to catch our breath and take a step back from when we started.

Two years ago, we vowed to make the old fog-signal plant on Level 2 a living quarters. Like the rest of the lighthouse, Level 2 was in pretty rough shape.

Thanks to some great friends and wonderful contractors, we’ve almost finished the job. It involved a whole lot of paint-scraping, new priming and painting, safe removal of hazardous material, restoration of the old oak flooring, replacement of the block-glass windows with faithful reproductions of the original oak casement windows, and even construction of a curved oak desk. We now have electricity, too!

Instead of peeling paint, wrecked floor and ceiling, and the horrible block-glass windows that choked out the fresh sea air, the old fog-signal plant is now a master bedroom.

Share Button
Bookmark the permalink.

One Comment

  1. Pingback: Keeper's suite almost finished - Graves Light Station

Leave a Reply

Your email address will not be published. Required fields are marked *