Springtime stabilization & restoration begins

Karl Phillips installs a faithful replacement of the original oak window sills.

Karl Phillips installs a faithful replacement of the original oak window sills.

A busy springtime week at Graves Light.

Karl Phillips, our master carpenter, puts the finishing touches on the new oak window sills and paneled surrounds that he made over the winter at his Nantucket workshop.

There are nine of these square windows at Graves Light.

Last year, Karl built exact reproductions of the original casement windows, installing them in time for winter to replace the un-authentic glass block that the Coast Guard had installed for easy maintenance once the original windows deteriorated.

Meanwhile, Mike and Brian Sylvester of CCI, who cleaned and pointed the outside of the tower last season, are now inside the lighthouse. They’re removing the rust that was eating away at the steel floor joists.

As the joists rusted, the expanding iron crushed and split the interior wall, breaking up the curved glazed bricks. About five of the joists need to be excavated from the walls, cleaned and painted, and the brick space around them re-tiled.

The “tiles” are actually glazed bricks. To do the re-tiling, we’re going to steal some curved glazed bricks from under the stairs, to keep the walls original.

 

Share Button

Secret cave discovered at Graves Light

Secret CaveWhile surveying the masonry today at Graves Light, Mike Sylvester of CCI contracting made an exciting discovery: A secret cave.  You’re looking at the first-ever picture from inside.

Share Button